- Installation
- Gutter System
Installing gutters and downpipes: the brackets, the slope and the joints
The gutters are installed before the roof covering. The brackets are set at most 80 cm apart, with the first and the last 10 cm from the edge of the roof, and are laid to a slope towards the downpipe. The downpipe is…
Read the article
